Home  /  HVAC Contractors

Four weeks a year you cannot answer the phone. Eight months you are wondering where the work went.

This is the HVAC side of Trade Template Co. — the sizing and pricing tools, the paperwork that wins the job, and honest guides to the three conversations that actually decide whether the business works: replace or repair, maintenance agreements, and getting through the season. Free, no lead-selling, run by an operator.

Price the job

Get the number right before you send it.

A system changeout and a ductwork job do not price the same way. Start with the tonnage calc for a rough sizing check, build the estimate off it, and confirm the markup before it goes out.

Calculator

HVAC Tonnage & BTU Calculator

A fast sizing sanity check by square footage and climate factors for quoting. Not a load calculation — run a Manual J before you actually select equipment.

Estimate

HVAC Estimate Template

Line-item estimate built around a real system-changeout job — the right shape for putting repair and replacement side by side on one page.

Calculator

Markup vs. Margin Calculator

Know the difference before you quote. A 30% markup and a 30% margin are not the same number, and the gap is where a season’s profit goes.

Reference

HVAC & Mechanical Code Quick-Reference

Plain-English, searchable index of 173 IMC, UMC and fuel-gas rules — combustion air, venting, condensate, ductwork and more. Verify against your adopted code.

Most HVAC contractors undercharge for one of two reasons: they size and price off gut feel instead of running the numbers, or they forget to build overhead and their own labor burden into the rate. Fix both and the same jobs get more profitable without raising a single price.

One thing worth saying plainly: the tonnage calculator here is for quoting speed. Equipment selection is a Manual J load calculation, with Manual S used to match real equipment performance data to it — and many jurisdictions require the load calc on the permit. A square-feet-per-ton rule of thumb is a sanity check, never a basis for putting a box on a pad.

One email a week, written for HVAC.

A new template or calculator as they ship, plus one pricing, paperwork or maintenance-plan idea you can use the same day. Not a newsletter about the industry — a short note about your paperwork.

No spam, unsubscribe anytime. We never sell your information or resell it as a lead.

Paid packs

When the free version stops being enough.

Everything above is free and stays free. The shop carries the deeper paid packs — multi-job tracking workbooks, pro document layouts and bundles that go past what a single free template covers.

HVAC-specific packs are being added to the shop now.

Rather than list products that are not there yet, here is the honest version: the shop currently carries cross-trade estimating, job-costing and proposal packs that work fine for HVAC, and HVAC-specific packs are in progress. This section will name them when they exist.

Browse the shop →

Quick answers

HVAC portal FAQ.

Are these tools actually free?

Yes. Every calculator, template, guide and code reference linked on this page is free to use, with no account required. Some deeper job-tracking packs and document bundles in the shop are paid, and those are always labeled as such. We do not sell your information and we do not resell you as a lead to anyone.

Is the tonnage calculator a substitute for a Manual J load calculation?

No, and it is worth being clear about it. It gives a fast, reasonable sizing estimate for quoting purposes so you can put a credible number in front of a customer quickly. Actual equipment selection is a Manual J load calculation with Manual S used to match real equipment performance data at design conditions — and many jurisdictions require the load calc on the permit. Square feet per ton is a sanity check, not a design method.

How current is the refrigerant guidance on this site?

We deliberately state only what is durable — that R-22 production and import in the US ended in 2020, that HFCs including R-410A are in an ongoing phase-down under the AIM Act, and that new equipment has been transitioning to lower-GWP A2L refrigerants with different handling requirements. We do not state current sector-by-sector GWP limits or compliance dates, because those have changed recently and have been subject to amendment and litigation. Where a claim needs checking, we say so and tell you to verify it against the current EPA rule and your distributor rather than trusting a web page.

Do I need Excel or Word to use the templates?

Most templates come in both Word and Excel-friendly layouts, plus a version you can fill in directly on the page and print or save as a PDF. The calculators all run in the browser on a phone — they are built to be usable from the truck, not just at a desk.

Can I use the code quick-reference to make a compliance decision?

Use it to find the rule quickly, then verify it. It is a plain-English index of mechanical and fuel-gas provisions, and codes are adopted locally — your jurisdiction may be on a different edition, may have amendments, and manufacturer instructions govern where they are more restrictive. It is built to save you the search, not to replace the adopted code book or your inspector.

Who is behind this?

One operator, not a software company or a lead aggregator. The tools exist because the paperwork side of running a trade business is genuinely tedious and most of what is available for it is either bad or expensive. More about the shop and the standards here.

Start with the one that matches your week.

The replace-or-repair worksheet if you are on a call. The queue model if you are buried. The maintenance-agreement model if you are trying to make sure next February looks different.

Open the maintenance agreement model →