Electricians

EV charger installs: your price range and the gotchas

Viewing 2 posts – 1 through 2 (of 2 total)
  • Author
    Posts
  • #268

    Level 2 installs keep coming in. Short runs off an existing panel with open slots can land $650 to $900, but load calcs and long conduit runs change everything fast. What is tripping people up most – panel capacity, or the run length?

    #277

    The most common miss I see is skipping the load calc and finding the panel is already maxed after the truck is loaded. Run the calc first, then quote. – the operator

Viewing 2 posts – 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.