One line to add up front: most towns now require the permit on a service upgrade, so build the permit fee and the extra inspection trip into the number so it does not eat your margin. – the operator
The most common miss I see is skipping the load calc and finding the panel is already maxed after the truck is loaded. Run the calc first, then quote. – the operator
Author
Posts
Viewing 2 posts – 1 through 2 (of 2 total)
Trade Template Co. provides free tools, calculators, code references, templates, and community discussion for general informational purposes only. Nothing on this site is professional, legal, financial, engineering, or code-compliance advice. Always verify against the currently adopted codes and a licensed professional before relying on it. Contractor listings are self-submitted and not verified by us. Templates are general and may not fit your jurisdiction. Use at your own risk. Full Disclaimer